生态休闲旅游 Zhangcun Town总体规划

日期: 2025-03-16 12:01:01|浏览: 155|编号: 97033

友情提醒:信息内容由网友发布,本站并不对内容真实性负责,请自鉴内容真实性。

生态休闲旅游 Zhangcun Town总体规划

在理论和三个代表的重要思想的指导下,彻底实施了科学的发展前景,将密集的土地用途作为核心,优化了城镇建筑土地的布局,并协调各种类型的建筑土地的布置,进一步增强了镇的受欢迎程度和品牌价值,成为“ 河中的 Town town town town town town town town town town town toby town town toby in and toby in toby in town。景观和生态旅游业的小镇,以及人类定居点的和谐度假胜地。

第7条(强制性文章)

该计划建议根据“中华人民共和国的城市和农村规划法”和相关的国家法规规定强制性规定。强制性规定是规划中必须严格遵循的指标;计划的强制性内容不得随意调整。强制规定的内容以本计划文本中的“强制性规定”的形式表达。

第8条(法律效应)

该计划包括计划文本,计划计划和计划描述。批准的规划文本和计划图纸具有相同的法律效果,并作为城市规划行政部门实施管理和指导下一个计划级别的准备的基础。

第2章发展策略第1条(总体战略目标)

大力发展生态休闲旅游经济,培养和扩展生态产业,并将镇建立成景观生态休闲和度假胜地,这些景观是生态休闲和度假,生态产业和生态文化,具有发达经济,社会进步,良好的生态环境和可持续的资源。

第2条(太空发展策略)

镇的空间开发策略是:“中央集聚,轴皮带扩展,道路网络优化和风景秀丽的斑点连接”。

集聚:促进城乡镇和地区的城乡农村融合建设,促进城镇和地区的生产,生活和旅游接待服务的聚集,并增强生长极的辐射能力;

轴向皮带延伸:指导生产和生活设施沿着Nanxi河和城镇的主要外部运输线延伸;

道路网络优化:专注于优化和改善城镇的外部运输网络,以增强风景秀丽的景点;

景点连接:以“大型运输,大生态,大型旅游业”为整体发展目标,并通过优化风景巨大的现场道路,例如山路和步行小径的连接,创建了串珠的西方生态旅游绿色弧。

第3条(工业发展策略)

在“生态优先,品牌促进,小城镇和地区以及第一和第三联系”的整体战略下,该计划将促进该镇中第一,第二和第三行业的协调发展,面对市场,专注于第三级行业,并专注于第三级行业。第一和第二行业将密切关注第三级行业,以调整工业发展方向和内部结构。具体来说:

首先,特殊的农业策略应充分利用山地和水资源,建立“高山品牌”和“黄浦江民品牌”,适应当地条件,发展特征和高质量的农业,并建立几个现代农业基础。

第二个是生态产业战略,遵守生态优先事项,并发展了生态和环保行业。

第三个是品牌旅游策略,政府指导和市场领导,三个旅游品牌众所周知“探索黄浦河的来源,参观了山房,并体验了She 风格”。

第3章城镇规划第1节人口和土地规模预测第1条(人口规模预测)

据计划,到近期,该镇的人口将为5,300,该镇的人口将为14,400;从长远来看,该镇的人口将为7,900,该镇的人口将为13,800。

第2条(土地规模的预测)

据计划,到2020年,对城市和农村建筑土地的控制将不超过190.43公顷,与当前的城市和农村建筑土地相比,降低了10公顷。其中,计划中的城市建筑土地为81.98公顷,在城镇规划区以外的村庄的建筑土地控制不得超过57.84公顷。

第2节:村庄和城镇系统规划的第1条(级别规模结构计划)

1。中央小镇。在2020年,计划中的居民人口为7,890,建筑土地为81.98公顷。

2。中央村庄。据计划,村和村是城镇级中央村庄,人口规模由1,000至1,500人控制,人均建筑土地管制为90至100平方米。

3。基层村庄。将行政村庄作为单位,人口通常不到1,000人,并且人均建设土地受到80到90平方米的控制。

第2条(功能结构计划)

1。1级:城镇。 镇区是该镇的政治,经济和文化中心。它的主要功能包括整个城镇的管理和公共服务职能,旅游分销,旅游招待会以及休闲和度假功能。

2。级别2:中央村庄。该镇的二级经济发展中心和农村综合服务中心计划从事某些生态工业生产职能,而长坦村( )则在该镇的某些规模上执行某些旅游接待服务功能。

3。第3级:基层村。基层村庄是每个村庄居民的定居点。它的功能主要是每个村庄的住宅功能以及简单的生产和生活服务功能。

第3条(太空布局结构规划)

镇的空间结构的形式是“一个中心,一个轴,两个皮带和六个风景景点”。

Yixin:镇区综合服务中心和旅游接待中心;

Axle One:也就是说,Nanxi河两侧的村庄发展的主轴是载体平台;

两条腰带:在该镇西部地区的弧形村庄和旅游业带周围建造集聚带;

六个风景景点:五个风景景点具有不同的主导功能,由计划确定,从北到南,即森林风景区域,云山 - 汤旺旺山风景区,她乡村民间文化公园,“箭头谷”主题 ,风景区域和自然保护区。

第3条的城镇综合运输计划(外部运输)第1条

以(-)高速公路和张尚(张蓬邦 - 镇)的高速公路为外部运输的主要骨架,旨在扩大中东高速公路红线至18米的高速公路,并将其范围扩大到标准的高度,并延伸到标准的范围,并将其范围扩大到标准的范围,并将其范围扩大到了标准的范围,并延伸了标准的范围。仪表,并将其升级到二等高速公路的标准,并尽快将其升级到省级高速公路;它计划根据三等标准扩大和翻新从莫山到杭盖镇到省级11号高速公路的县道,道路宽度为18米。

第2条(农村公路)

该计划是根据10到12米的红线的宽度,翻新从城镇到,高山,和到的四个乡村道路,并改善乡村镇连接频道。

高速公路是通往该镇风景秀丽地区的主要道路,根据县级道路设计。道路红线的宽度在不少于12米处受到控制,并将长期向南延伸至风景区域。

第4节:城镇社会服务设施计划(教育设施计划)的第1条

计划目标是提高具有高标准和高质量的九年强制性教育的质量,并普及学龄前教育。

小学和中学:小学的现状将被保留。根据高层规划的要求,中学将在短期和中期保留。从长远来看,在有条件时将合并中学。中学将在Baofu镇建立。

幼儿园:计划在镇上建立四个幼儿园,即 Town 幼儿园,幼儿园,幼儿园和幼儿园。乡村幼儿园的其余部分将在不久的将来保留,并将在未来纳入计划中的幼儿园。

第2条(卫生设施计划)

计划镇由城镇卫生中心和乡村卫生服务站的两级医疗和卫生系统组成,在县,城镇和乡村级别建立了一个三级预防和卫生保健网络。

Town 计划扩展到65张床,为整个城镇提供服务。

计划在 和 的每个村庄建立一个村级卫生服务站。村诊所将继续将行政村庄作为基础,改善农村三级预防和医疗保健网络,并确保每个村庄中不少于一个村庄诊所。

第3条(文化和体育设施规划)

改善文化设施,并根据城镇(村庄)的水平分配文化设施。

该计划着重于城市地区城镇级别和住宅级文化和体育设施的建设,中央乡村社区配备了一些小型文化和体育活动设施,以促进基层乡村居民的需求。

第4条(旅游服务设施计划)

该计划着重于提高该镇旅游服务设施的接收能力。计划集中在小学北侧, Park的南侧和 风景区域周围地区的柔和斜坡上。 It is set up such as , , shops and other in Area, - Area, and Area to guide the of , and the four-in-one of ", , food and ", so that can the 山景。

第5条(农业服务设施计划)

结合农业机械化运营以及现代农业公园的建设,农业机械销售,维护站,兽医站,农业技术促进站以及其他城镇的农业服务设施,应在城镇中建立,以指导大型和现代化的生态农业和现代农业特征和现代化的营业。

第5节:城镇生态功能分区和空间控制的第1条(生态功​​能分区)

根据生态敏感性的差异,该镇分为三个功能区域:

Nanxi河沿岸的城市生态功能区,该镇是核心;

A -type zone of six belt- river the — , — , 'an—, Pass—Zhang , —Zhang , , —;

平均高度超过300米的山型自然生态功能区域。

第2条(空间控制)

该镇的土地利用分为三种管制区域:合适的建筑区域,受限的建筑区域和禁止的建筑区域。

1。合适的建筑区域

它主要指的是城镇和村庄的建筑土地,包括当前的建筑区域和计划的城市建筑土地,乡村建筑土地,独立工业和采矿地点土地以及保留的城市和农村发展备用土地,根据镇的长期发展需求。这是非农业生产和生活的关键领域。一方面,计划应对现有的建筑区域进行全面的修复,以改善生产和生活环境。另一方面,应实施增长管理,城市空间扩展合理地指导,并过度传播建筑土地,尤其是备用土地的过早发展。

2。限制的建筑区域

在某些地区,必须在一定距离内安全控制高压走廊,大型市政基础设施,交通走廊等,以及具有相对敏感环境的地区,例如旅游景点,旅游业开发地,农田,生态保护林,森林林地,低山和柔和的山坡和柔和的山坡。原则上,该地区仅允许农业生产发展,该地区的居民区和企业的集中布局受到指导。

3。禁止的建筑区域

它主要是对生态敏感的地区,例如山脉,河流,水库,自然储量,湿地,重要的海滨区,水源保护区等,自然斜率高于25º。该计划严格保护现有的生态环境。除了在风景秀丽的服务地区必须安排的支持设施和农田水库设施外,严格禁止进入与保护无关的新项目的区域。现有的定居点和工业企业应从该领域转移。

第6节城镇生态旅游计划(计划结构)的第1条

基于镇旅游资源的分配特征和潜在发展价值,该产品系列是省自然保护区作为主体和 River ,作为横幅和产品形象,确定了旗帜和产品图像,并建立了一个心脏,一个腰带和六场风景的旅游空间布局结构。

Yixin:也就是说,Nanxi河流风格的生态旅游小镇是镇上旅游接待中心,作为空间载体;

一个区域:Nanxi河风格的旅游带;

六个风景景点:6个生态旅游主题风景景点,朗旺山风景秀丽的地区,风景秀丽的地区,她乡村民间文化公园,-风景秀丽的地区,箭头谷“主题竹制天堂”和森林风景区域。

第2条(产品设计)

该计划依靠绿山,美丽的水,竹海,村庄和奇怪的石头(山峰岩石)的五个主要特征景观元素,镇有三张旅游名片:“黄普河的来源,高山农业和她的乡村文化”。它专注于开发一系列以“山,水,竹子和村庄”为主题的旅游产品,并专注于开发五个精品旅游线,包括山脉观光和体育旅行,黄普河源追踪巡回赛,竹制工业体验巡回赛,阿尔卑斯山家庭休闲旅游以及宗教历史和文化旅游。

第3条(发展控制)

遵守保护优先级和中等结构的原则,完全考虑视觉敏感性因素,减少人工结构对自然生态学的影响,并保持该地区的整体清晰和遥远的环境氛围。指定非建设区域,风景秀丽的现场开发主要基于大量的绿色空间,控制着风景秀丽的大规模房地产开发。旅游服务设施的布局应考虑地形,地质和其他因素,并且在建筑设计之前应进行地质评估。

第4章:城市城镇的自然和规模第1条(城市城镇的自然)

River的来源是北江北部的高峰,是一个重要的生态旅游中心,以休闲,度假和特征性的贸易为主。

第2条(主要功能)

镇的主要职能是:北北部的休闲和度假胜地;安吉县南部的黄普河源风景区和第三级旅游接待中心的重要组成部分;城镇的政治,经济和文化中心;以及一个地区贸易中心,主要基于山区的当地特色菜和旅游纪念产品。

第3条(城市规模)

最近到2015年,城市总人口为5,260,其中永久人口为3,940,建筑土地管制为52.6公顷,人均建筑土地管制为每人100平方米;

从长远来看,城市总人口将为7,890,其中永久人口为5,950,建筑土地管制将为81.98公顷,人均建筑土地管制将为每人103.90平方米。

第5章城市土地布局计划第1条土地布局结构第1条(土地使用控制)

该规划区域的土地使用分为以下四类受控区域。

当前的建筑区域:也就是说,狭窄的走廊区域位于旧城区的到河的两侧,长约1公里,宽约0.15-0.4公里。

合适的建筑区域:主要包括nanxi河两侧的当前建筑区域,塔利北路和托利南路的西侧的宽松坡度和露台区域,以及 Old 的西部和北部地区。

受限的建筑区域:一个地区是杜山,贝甘和赫根等城镇周围的当前村庄,以及林芬寺森林农场北侧的河谷地区。根据该镇的长期发展需求,必须控制保留区域;另一个是由于生态保护需求而受到控制的区域,包括山周围的生态缓冲区,低山和柔和的坡度,和Hegai周围的土地以及Nanxi河两侧的20-50米长的区域内。

禁止的建筑区域:主要是计划区域内的水域和生态森林。

第2条(城镇土地发展方向/强制性法规)

基于当前的情况,该计划确定城镇中城市土地的发展方向是“控制东部,向西前进,向南扩展,向北延伸,并在中间有所改善”。土地使用性质主要是住宅,公共设施和旅游土地。

第3条(布局结构)

镇区计划形成一个布局结构,该结构为“一条腰带,两个轴和多个组”。

一条腰带:沿Nanxi河沿线的城市海滨景观皮带。

两个轴:南北塔利路沿线的城市发展的主要轴,以及沿着安宁路( Road)沿线发展发展的城市发展的次要轴。

多个小组:在北部三个主要居住区的整体发展模式的指导下,中部地区的综合服务以及南部地区,进一步细分了Hexi居住集团, Group, Group,Hegai Group,Hegai Area Sivic Area Group and Park Group。

第2节城市土地布局规划(土地利用组成)

的城市土地由六个主要类别的城市建设土地组成,包括住宅用地(包括商业和住宅土地),公共设施土地,公路广场土地,外部运输土地,工程设施土地和绿色空间。

第2条(住宅/商业土地规划)

1。计划和布局

计划中的城镇地区的住宅土地集中在南西河下游和南部新区的两侧,商业和住宅土地主要集中在塔利路上。

2。支持服务设施的布局

增加旧城区居民区的有机更新,改善旧城区的环境质量,并专注于改善文化和体育设施的内容;新建的住宅区将根据“城市住宅区规划和设计法规”的相关要求改善相应的支持设施;考虑到人口衰老的社会发展需求,分配并改善了老年公寓,养老院和老年俱乐部等设施的内容。

3。计划土地使用指标

计划中的住宅总面积为33.75公顷,占城市总建筑土地面积的41.17%,人均住宅土地面积为42.78平方米;计划的商业和住宅土地面积为2.44公顷,人均土地面积为3.09平方米。

4。土地开发指导

遵守适应当地条件,统一计划和分阶段实施的原则,并根据基于社区的管理模式建立现代住宅区;考虑到旧地区的土地利用空间不足,增加了南西河两侧的垂直绿色;城镇居民的商业住房主要是3-4层,住宅的住房主要是2-3层。可以在主要道路上考虑商业和住宅混合建筑的建造。目前,在的公园对面安排了一块商业和住宅的混合土地。住宅土地的建设密度不得超过35%,绿化率不得小于30%。商业土地和住宅土地的建设密度应适当增加,但不会影响居民的正常生活和照明要求。

第3条(公共设施土地规划)

计划的公共设施土地总面积为16.25公顷,占计划中城市建筑总数的19.82%。其中,有1.04公顷的行政办公土地,1.45公顷的文化和娱乐土地,0.58公顷的医疗和卫生设施土地,6.84公顷的商业和金融土地以及2.60公顷的集体市场土地。特定如下

1。行政管理的土地布局

在此计划期间,保留了镇政府的现状,土地规模保留至1.04公顷,占建筑总土地的1.27%。结合该地块的详细规划,该地块中设置了一定规模的公共停车场。

2。教育机构的土地

城镇的教育设施主要保留在当前情况下,一名幼儿园和一所小学和中学安排。计划中的教育机构的土地总面积为3.74公顷,占计划建筑总土地总面积的4.56%,人均建筑土地为每人4.74平方米。

初中:原始地点计划保留,土地使用量表为1.26公顷。将来,可以考虑合并到Baofu镇。

小学:当前情况被保留,计划的土地面积为1.81公顷;

幼儿园:计划保留该镇的当前状况,并将其土地使用规模扩大到0.67公顷。

3。文化和体育设施的土地

该计划与长旺庙风景区域的扩展相结合,新的文化和体育设施以及全面的娱乐土地相反。计划中的文化和体育科学技术土地的总面积为1.45公顷,占计划建筑土地总面积的1.77%,人均土地面积为1.84平方米。其中,新建的文化和体育科学技术中心计划的土地面积为0.8公顷, 的土地面积为0.65公顷。

4。医疗保健土地

该计划是保留当前的保健中心并将其土地利用量表扩展到0.58公顷,占计划土地总面积的0.71%,人均土地使用率为0.74平方米。改善当前的医疗设施,医疗床的数量已增加到65个。

5。商业和金融土地

专注于用购物中心及其南部地块作为核心改善地面商业中心,并建立一条沿 Road的两侧和Nanxi河两侧分布的交叉形状的商业带。南部住宅集团将适度地安排塔利南路的商业腰带。计划的商业和金融土地的总面积为6.84公顷,占计划建筑土地总面积的8.34%,人均土地面积约为8.67平方米。

6。市场土地

目前的 Road市场计划保留当前状态,计划的土地面积为0.37公顷,并且在城镇南侧的正门附近建造了一个由特色旅游产品和当地专业主导的新市场。计划的土地面积为2.24公顷。

计划中的集体市场的总土地面积为2.60公顷,占计划建筑总土地总面积的3.17%,人均土地面积约为3.30平方米。

第3节格陵兰供水系统规划第1条(规划结构)

该计划采用了河滨皮带形绿色和点形绿色空间的结合,形成了“一条腰带,两个走廊,两个区域和五个节点”的空间景观结构,并建立了一个集成“山脉,水和城镇”的景观旅游中心。

一个区域:也就是说,纳克河的海滨景观带;

两个走廊:两个生态绿色走廊,周围是东西方山脉;

两个区域: Park风景区和 Park风景区域;

五个节点:西侧的绿色景观节点, Road- Road的交汇处的绿色景观节点,的West Park的绿色景观节点, Park new and with Park and the Shew New Park and with Scape new

第2条(城镇公园)

该计划是基于塔利山(Taoli )的良好生态环境,主要集中于生态休闲,并且在Nanxi河的两侧建造了一个新的海滨公园。

第3条(海滨绿地)

该计划基于Nanxi河和计划中的运输岛,并作为公共绿色空间建立。该镇南部新区海滨地区的公共绿色空间的宽度原则上不少于10米。

第4条(保护性绿色空间/强制性法规)

在进入地面之前,计划中的35kV电源线走廊的宽度不少于20米,并且土地周围的保护绿色空间的宽度不少于10米。

第5条(绿色空间指标)

计划的绿色空间的总面积为7.78公顷,占计划建筑土地总面积的9.49%,公共绿色空间面积为7.8公顷,人均公共绿色空间面积为9.10平方米。

第6条(供水系统控制/强制性规定)

计划中的水区为12.15公顷(不包括泥浆),计划的水区及其海滩区域不得侵占。

第6章城市道路交通规划第1条(外部运输)

该镇的外部运输主要是公交车站。计划将来将安宁公路车站搬到该镇南部的正门,并计划为新的汽车站建造1.24公顷的土地。

第2条(道路网络系统计划)

计划中的城镇道路采用网格状的路线布局表格,分为三个层次:主要道路,次要道路和分支路,根据每条道路的不同功能。

主要道路:14-20米,次要道路:12-16米,分支路:7-14米。 (有关详细信息,请参见附录II)

第3条(静态交通设施计划)

1。公共停车场

计划在文化和体育技术土地的南侧以及汽车站的北侧建立一个集中的公共停车场,其余的停车场和公共建筑是建造和建造的。公共停车场土地面积为1.16公顷。

2。加油站

目前的塔利山南部脚的加油站计划保留,土地面积为0.14公顷。

第4条(交叉计划)

所有计划中的城镇交叉点都是平面交叉的形式,主舱,主中继和次级躯干相交应以信号光控制的形式进行。

第5条(规划指标)

计划中的城镇地区的外部运输土地为1.24公顷,占城镇地区总建筑土地的1.51%。计划中的公路土地为19.48公顷,占该镇总建筑土地的23.76%。

第7章市政工程设施规划第1节供水项目计划第1条(水源计划/强制性法规)

The Nanxi River, a of the River, is to be the water for water in the town, and is used as a water .

2 ( of urban water )

The high-level water pool in the town is and . The town water a safe ring water model to form a ring water form with a large ring and small rings. The main water pipe is laid along the main roads in the town area, and the of the water pipe is DN200-DN150. After the new water plant is , the pipe to the town will be laid along the -level with a pipe of DN200.

3 (Town Water )

A new tap water plant is to be built at the of two in , with a scale of 3,500 tons/day and an area of ​​no less than 9,000 . The water is Nanxi River, which can be by the power of the the dry water.

The water used in near the newly built water plant in the town is by the water plant, and the water pipe is laid along the -level ; the water used in other is built in small water , and the water can be made of small water, water, water or to be .

2 1 ( )

The town the , and the of pipes be when up pipes. The of other in the town is to be a , and will be to a and after are ripe.

2 ( )

Town: The of the micro- in the town is 2,000 tons/day, an area of ​​no less than 3,000 , and two in the north of the town.

Town: The that have been built in the town are . can be set up in other in the and water . The land area is at 3-5 /ton. If there is no water body in the , tanks can be set up, which are set up to the of 1.5 /.

3 ( )

The town is into two with the south as the . The main pipe west of Nanxi is laid along Road, and the main pipe east of Nanxi is laid along Road and Taoli South Road. The main pipe is d300-d400 and the pipe is d300. The is by the micro- .

4 ( )

The in Town is to the in Anji :

(L/S·ha), where

q —— rain (L/S·ha);

P ——The is 0.5-1.0 years, 0.5 years, and plots are 1.0 years;

t ——The takes 15 ;

The is 0.6, and the water time is in 10 .

5 ( Pipe )

The town is into three with the of the south and the road. Each zone has one port, and a total of three ports are set up in the town. pipes are laid on the roads the town, and the near the can be set as a canal, with the of the pipes D300-D500.

3 Power 1 (Power )

The plan the of the town and the , and the and land needs of the town and . The in other is from the small .

2 (Power Grid )

The town power grid is of three-level power lines of 35kV -10kV -0.22/0.38kV low- .

The 35KV line is cable, with the width by no less than 20 . The line the town is to if ; the 10KV is to use , lay along the main roads of the town, and first adopt the ring joint open-loop , and at the same time, the is in with the 10kV and and the - cable ; the 0.22/0.38KV low- line is , and a 10KV is to the 10KV to the not 300, and 2 2× are set up in the town.

4 1 (Cable TV)

It is to the of the "three- " of the , radio and and in the town, and the of radio and . The radio and come from Anji . The radio and an SDH and a ring . By 2020, the radio and rate of the town will reach 100%.

2 (Post )

The plan is to the of Road in the town and in with land, and , with a long-term of 20,377 doors.

3 ( )

The in the town are laid along the main roads; in to the , the of pipe holes is also for other and cable TV needs and is .

lines to each are by .

5 Gas 1 (Gas )

, Town has used gas as the main ; in the long run, the gas model is based on gas and as the . Rural areas guide to use gas.

2 ( )

It is to set up gas at a scale of no more than 1,000 , and the are far away from urban and rural areas to safe . In the , gas be laid in areas. In , it be on the west and north side of the road or under the green belt. The gas main pipe is in an shape, and the pipes be in a shape.

6 1 ( )

By the end of the , the goals of the town's are: the of and semi- of will reach 90%; the rate of will reach 100%; the of of water- will reach 100%; and the of of road will reach 50%.

2 ( )

1. the

: Plan to the of two and the .

: Plan and , and and the of to the of no more than 800 . The scale of for new is not less than 4 tons/day; each has set up at least one .

: Focus on the town , and the of urban in with the of the "City Area and Code".

2. the of

The in the town are set up for one of 2,500 to 3,000 . There are 3 in the town. The in the main are set up to 300 to 500 , and the are not more than 800 . The in the town are with and , and the area of ​​the is 60 and 170 .

3. Build and such as car wash yards, shops and other at the main and exits of the town.

4. Do a good job in urban and the town .

8 Plan 1 ( Plan )

1.

The is in the -96 " Air " Level II , and the rate of smoke and dust areas in the area 100%.

2. Water

The water is the area of the " Water " of 3838-2002. The river water meets the water to its . The water of the Town meets the Class II water body. The water of the water first-level zone and the -level zone of the newly built water plant meets the Class II.

3. Sound

Noise -93 "Urban Area Noise " area . The rate of the noise area in the area 100%.

4. Three waste

Solid waste is to meet the goals of , , and ; waste is and , and the rate 100%; the rate of in towns more than 95%.

5.

land , and , and ; do a good job in to and of and in the area, form a in the town and , and the rate in the town more than 80%.

2 ( )

1. the town , and , and focus on the town water, sound and .

2. to build , , and urban and rural water .

3. in and , do a good job in soil and water in the river basin, , and the green .

4. to , and the and of solid waste.

5. plans and town plans, the of areas and , and the rate of the town.

9 Plan 1 (Flood Plan/ )

1. Flood

The flood for towns and are once in 10 years, and the are once in 10 years, and is once in 2 days.

2. Flood and

The plan based on "" to the of , the water level of , and give full play to the role of in flood . The areas will and , and of river . It is to go to river and waste soil and waste . At the same time, the and of the flood water be , the Nanxi Port be and , the be , and the lives and of the be from .

2 (Fire / )

1. Fire

A -level fire is to be set up in the of the of Taoli South Road and Min'an Road. The land use scale is 0.27 , and the fire force is to . The fire scope is the town.

2. Fire water

The fire water is the water of the town, and water are used as water . Fire and water are used in with urban water , fire are , with the not 120 and the not 150 .

3.

The main roads in the area have at least two and exits; the main roads in the area be to the roads in at least two ; the of and exits of motor lanes be , and the and exits not be less than 150m. When the of a along the 160m, a fire truck of no less than 4m×4m be set up. The exits not 80m. When the of the 80m, be added on the floor.

The width of the fire lane shall not be less than 4 , the net shall not be less than 4 , and the the line of the fire shall not 120 .

The of the " Fire Code".

3 (Civil / )

1.

the civil of long-term , key , and peace and war, and build air in with the and Civil :

(1) Civil with a depth of more than ten ( ten ) or more than three ( three ) shall be built to the first floor area of ​​the floor;

(2) for other civil for (1) and , if the total floor area is more than 2,000 (), a level 6 () or above air raid shall be built at 3% of the area;

Other civil for (1) and shall be at 3% of the total floor area of ​​one-time ;

居民住宅楼(包括整体拆建的居民住宅楼),按照地面首层建筑面积修建6B级防空地下室;

条件不满足的民用建筑,在经人民防空行政管理部门的批准后,可不建防空地下室,但应缴纳相应的人防工程异地建设费。

2、规划措施

结合安吉县人防规划,建立一个完善的布局合理的防护工程体系,以防高技术常规武器打击及防化为重点,着重提高整体抗毁能力。

加强通信警报系统建设,结合新建小区的建设设置警报器,加强有线、无线、移动通信建设,形成有效的通信网络。

确保战时人员防护,修建人员掩蔽系统。按照留城人员比重30%,人均1平方米的掩蔽面积标准,掩蔽工程建设应依托山体,着眼于人口稠密地区,解决人员就近分散掩蔽,分片划分人防设施区域。

在规划期内逐步提高人均人防工程拥有量,不断完善人防工程体系,提高防护效益。

加强人防与城镇道路交通、停车场、消防、抗震等专项工程的衔接。

第4条(地质灾害防治规划/强制性规定)

1、灾害防治分区

依据全镇现状地质灾害点的分布情况,将全镇划分为高二滑坡灾害重点防治区、石门滑坡崩塌灾害中度防治区和镇域中部-南部杭垓滑坡泥石流灾害一般防治区等三类。

2、规划防治措施

加强重点地质灾害点详查与勘查,并进行科学评估,提出综合治理方案;

由政府牵头,加大山区地质灾害点防治资金投入,采取相应工程措施消除潜在危害,治理费用过大的区域采用近期搬迁避让方式解决;

全面开展建设项目的地质灾害危险性综合评估工程,并提出相应的防治措施,从源头上防治灾害的发生;

建立和完善群测群防网络与应急系统,提高突发性地质灾害的反应能力;

编制章村镇地质灾害综合防治规划,进一步明确整治目标与任务。

第十章近期建设规划第1条(规划目标)

根据总体规划确定的总体目标及中心城镇的发展趋势,确定近期建设规划的总体目标为:以旅游业为主要推理的镇域社会经济全面发展;城镇“一河两岸”带状组团发展的空间形态基本架构完成;完成镇区退二进三工作;城镇公共服务与旅游接待能力有明显提升;山水生态旅游城镇的品牌形象基本确立。

第2条(近期期限与规模)

近期建设规划期限为2009—2015年,镇区人口规模为5260人,城镇建设用地规模为52.6公顷。

第3条(规划重点)

1、公共设施提升

重点新建镇文体科技中心、扩建龙王寺等政府投资类公共设施建设项目,并运用市场机制提升安宁路南侧农贸市场和浦源商城项目等招商类项目。

2、环境综合整治

完成镇区老居住区环境综合整治、偏远小地区山民的搬迁安置,以桃李南路和南溪河上游景观建设。

3、基础设施完善

改造安宁路西段和依山北路;新建桃李路北段、龙王山路南段、民安路、灵峰路、新兴路和府前路;完成镇区现有高位水池和微动力污水处理设施一期扩建工程;新建消防站一座。

4、旅游项目开发

结合龙王寺景区和桃李山公园的开发,启动镇区内占地约5.0公顷的旅游用地开发。

第十一章附则第1条(审批解释权)

本规划由安吉县人民政府负责审批,其解释权属安吉县人民政府城市规划管理行政主管部门。

第2条(规划生效)

本规划自安吉县人民政府批准之日起生效。

第3条(规划调整)

确因经济和社会发展需要,可以对本规划进行局部调整,并报原审批机关备案。但涉及重大事项调整的,必须报安吉县人民政府审批。

第4条(规划实施)

本规划由章村镇人民政府组织实施,安吉县城市规划行政主管部门依据本规划实施管理。

-59861-596-乡镇土地利用整体规划(大社区不设此栏目)

提醒:请联系我时一定说明是从101箱包皮具网上看到的!